Brage is an oil field with some gas. The Brage platform is an integrated accommodation, processing and drilling installation on a steel jacket. The field started operating in 1993 and reached top production in 1998 at 120,000 barrels of oil per day. Brage currently produces 25,000 barrels per day. Transport The oil is transported in a pipeline to Oseberg A for further transport through the Oseberg Transport System (OTS) to the terminal at Sture in Øygarden municipality in western Norway. The gas is sent in its own pipeline to Statpipe for further transport.
Brage, North Sea, Equinor, Europe,