an eight-inch production line and a three-inch gas lift line to be installed to flow the field back to Tartan
Duart, North Sea, Talisman, Europe(North),
The Subsea Industry Knowledge Base
an eight-inch production line and a three-inch gas lift line to be installed to flow the field back to Tartan
Duart, North Sea, Talisman, Europe(North),