Sleipner East has been developed with the Sleipner A drilling and production platform, which is linked by bridge to a gas treatment platform and a flare stack. Production started in August 1993. As part of the Sleipner East development, the Loke and Sigyn gas and condensate satellite has been tied back to Sleipner A. Condensate from Sleipner East is piped to Kårstø north of Stavanger for processing. Gas from the field is transported in the Statpipe and Zeepipe to Emden and Zeebrugge in Belgium.
Sleipner East, North Sea, Equinor, Europe,