An engineer is required to develop a detailed inspection scope for each of the FPSO’s 59 hull tanks to form the basis of the inspection workpack.
The Subsea Industry Knowledge Base
An engineer is required to develop a detailed inspection scope for each of the FPSO’s 59 hull tanks to form the basis of the inspection workpack.